INFORMATION ON CASE SHR09-00002
|
|
|
|
| Status: |
| Name: |
| Address: |
| Application Date: |
| Parcel: |
|
|
|
| Description: |
Substantial Development Permit to construct a new
fully grated pier and freestanding boatlift. |
|
|
|
|
|
| |
|
|
|
|
|
|
|
| |
| |
|
|
|
|
|
|
|
|
| |
|
|
ACTIVITY ON CASE SHR09-00002
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Notes: 5/27/09 dmg - distributed plans for review and comment to Deb Powers. Comments are requsted by 6/16/09
|
|
|
|
|
| |
|
|
APP. COMPLETE/DECN. DEADLINE
|
|
|
|
|
|
City Staff: Desiree Goble
|
|
|
|
|
|
|
|
|
|
|
|
|
| |
|
|
|
|
|
|
City Staff: Rob Jammerman
|
|
|
|
|
|
|
|
|
|
Notes: No PW comments or conditions
|
|
|
|
|
| |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Notes: R-2 Standpipe required.
|
|
|
|
|
| |
|
|
|
|
|
|
|
|
|
|
|
|
|
| Notes: See conditions. |
| 5/27/09 dmg - distributed plans for review and comment to Tom Jensen. Comments are requsted by 6/16/09 |
|
|
|
|
|
| |
|
|
APP. RECEIVED/DET. COMP. REQD.
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
| |
|
|
SEND DET. COMPLETENESS LETTER
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
| |
|
|
MAIL NOTICE OF APPLICATION
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
| |
|
|
WEB - OPEN CASE FOR COMMENT
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
| |
|
|
PUBLISH NOTICE OF APPLICATION
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
| |
|
|
WEB - CLOSE & PRINT COMMENTS
|
|
|
|
|
|
City Staff: Desiree Goble
|
|
|
|
|
|
|
|
| |
|
|
|
| |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
| |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
| |
|
|
DISTRIBUTE NOTICE OF DECISION
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
| |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
| |
|
|
DISTRIBUTE NOTICE OF APPROVAL
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
| |
|
|
| |
|
|
|
|
|
|
|
|
|
|
| |
|
|
INSPECTIONS ON CASE SHR09-00002
|
|
|
| |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
There are no inspections on this case.
|
|
|
| |
|
| |
|
|
|
|
| |
|
|
CONDITIONS ON CASE SHR09-00002
|
|
|
|
|
***FIRE DEPARTMENT CONDITIONS***
|
|
|
|
|
A Key box is required. It shall be installed in an approved accessible location no higher than six feet above grade.
|
|
|
|
fire department siamese connections shall be located adjacent to fire department apparatus access. The location shall be
approved by the Fire Marshal. The desired distance between FD connection and hydrant is 40 feet.
|
|
|
|
A Standpipe is required. Submit three sets of plans for approval. The plans shall include and isometric elevation drawing of
the entire standpipe system including location of any isolation valves.
|
|
|
|
|
***Building Department Comments***
|
|
|
|
Structures must comply with 2006 editions of the International Building, Mechanical and Fire Codes and the Uniform Plumbing
Code as adopted and amended by the State of Washington and the City of Kirkland.
|
|
|
|
Structures must be designed for seismic catagory D, wind speed of 85 miles per hour and exposure C. Provide structural
calculations and details with the building permit application.
|
|
|
|
|
| |
|
|
|
|
| |
|
|
|
|
| |
|
|
|
|
|
|
|
|
|
| |
|
|
DOWNLOADABLE DOCUMENTS FOR CASE SHR09-00002
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
If no documents are listed, then no downloadable documents are available for this permit.
|
|
|
Copyright © 2003 by Accela, Inc. To comment on this page, contact the kirklandpermits.net Administrator
Version: 3.1.1.20030408.02
|